Quantcast
Channel: SYNCHRO Construction Solution
Viewing all articles
Browse latest Browse all 6333

Forum Post: How to proper Synchronize Synchro 4D Pro model to Control with SP file

$
0
0
Here we go again. my project has an iModel based on SP file. SP4D upgrades easily all the updates I do locally into Control. Except for UF in 3D object. I have exported into excel several attributes for 3D objects, modified/updated them in excel and reimported them back in SP4D. The iModel got updated accordingly in the background. The day after I open the control model and I realize the attributes were updated but the reference to the 3D objects was completely wrong. I decided to re-synch the 3D model from its original .spx file to reset the attributes. I can see all attributes being reset..... for a minute: the next synchronization, instead of sending the new data to Control, gets all the data FROM control bringing again the situation with the wrong data reference. There is no way (at least that I know) to have control of this process as it does everything in automatic. How can I prevent this behaviour? or should I de-link the sp file, do my stuff and manually upload the SP file to re-set the situation? Regards

Viewing all articles
Browse latest Browse all 6333

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>