Hello, I have a 3d model in navisworks with links, when doing the synchronization from, synchro 4d will be able to read the links (attached in the bim elements), to be opened in the Synchro Documents tab? Or do I have to assign everything again from Synchro 4d? I would appreciate some tips Diego
↧