Forum Post: RE: Transfer User Fields of resource Groups
Yes!! It works!. It is important to keep capital letters for the UF (in my case). Thank you very much Indrawan.
View ArticleForum Post: RE: Transfer User Fields of resource Groups
Ups... Yes you are correct, it is case sensitive. Good it works. Best regards, Indrawan
View ArticleForum Post: RE: Unscheduled Links
Dear Indrawan, Thank you for your attention. I checked it and there are no constraints. I exported my schedule to Primavera P6 to check and I don't have a problem there.
View ArticleForum Post: RE: Unscheduled Links
Hi there, All looks good for me, I am really curios with this issue. Would you be able to share the XML file for review? You can upload your file here -...
View ArticleForum Post: RE: SYNCHRO AWP
Hello Pavel, A Bentley Professional Services Colleague will reach out. Regarding product enhancements and feature requests please submit to SYNCHRO Control Ideas Portal (aha.io)
View ArticleForum Post: RE: SYNCHRO Control
Understood Anastasia. SYNCHRO 4D Pro is a desktop product that may work standalone however to have the collaboration and communications capabilities SAAS is required.
View ArticleForum Post: Coffee Corner: SYNCHRO - Cost & Perform
Title : Coffee Corner: SYNCHRO - Cost & Perform Presenters : Ryan Posnikoff, Director, Product Management, Construction, Bentley Systems Inc and Matt Starke, Director, Product Management,...
View ArticleForum Post: RE: IFC Import surfaces
Hi, I'm having the exact same issue. How was this resolved?
View ArticleForum Post: Calendar non-working time not matching imported XML
Hi, I have imported into Synchro an MS Project programme, via a created XML file. I have a set calendar within MS Project that covers particularly Saturday as a work day. When I import the calendar,...
View ArticleForum Post: RE: Calendar non-working time not matching imported XML
Hi Scottie, Once you select the calendar and assign it to selected tasks, does it update the calendar in the General tab under Task properties? Also, please remember to click on Reschedule under Plan...
View ArticleComment on SYNCHRO SCRIPT
Was trying to change the resource type via Script, do you know if it is possible? It seems not supported yet. Here is the Script we were trying: RESOURCE(SELECTED) SET_PROPERTY(TYPE, ENUM:EQUIPMENT)
View ArticleWiki Page: SYNCHRO Control
SYNCHRO Control is a project management solution built with custom-fitted workflows, dashboards, and the flexibility to connect external data sources, like ProjectWise and SharePoint. For more...
View ArticleWiki Page: SYNCHRO 4D Power BI Data Connector
1. Introduction This document outlines the steps required to setup SYNCHRO 4D Data Connector for Power BI Desktop. 2. Prerequisites 2.1. Power BI Desktop You will need Power BI Desktop (free BI tool)...
View ArticleForum Post: RE: synchro script Volume Resource to TASK UF
Hello Arpit Prakash . I am trying to run a script I think is similar to the one above. In my case each of the piles linked to the pile foundation activities has this parameter called "Peso de Aco...
View ArticleWiki Page: SYNCHRO Perform
SYNCHRO Perform (formerly E7) is the leading field-based construction delivery platform, connecting project leaders with real-time insights and providing unparalleled visibility of project performance....
View ArticleWiki Page: Working from home with SYNCHRO
Details of How to Work from Home with SYNCHRO Hardware Minimum Requirements Operating System: Microsoft Windows 7 (x64), 8 (x64) or 10 (x64) Processor: Intel ® Core i7-3840QM CPU @ 2.80GHz 2.80 GHz...
View ArticleWiki Page: SYNCHRO 4D
SYNCHRO 4D Enabled Applications for Virtual Construction Planning, Simulation, and Project Controls The intrinsic relationship between people, process and technology creates the foundation for...
View Article