Forum Post: RE: Hi team, Can you suggest me the best way to import/sync...
Hi team, Sorry, please ignore the previous post. I am going to reframe the query again- "The BL Start & BL Finish columns are empty in Synchro , hence the baseline start and baseline finish dates...
View ArticleWiki Page: SYNCHRO Pro - 4D Pro Trial message window when upgrading to 2019.2...
"Trial Expired, SYNCHRO 4D Pro" or "SYNCHRO 4D Pro Trial" message window when upgrading to 2019.2 (v6.2) SYNCHRO 4D Pro is a new license introduced to 2019.2 (v6.2) that enables the iModel...
View ArticleForum Post: RE: Hi team, Can you suggest me the best way to import/sync...
Hi Khushal, We cannot bring into SYNCHRO the baselines from P6. There is a workaround though and it can be found here:...
View ArticleForum Post: RE: Re-sync .bim in LumenRT and Re-use of already created scenes
Hi, Is there any update on this?
View ArticleForum Post: RE: Re-sync .bim in LumenRT and Re-use of already created scenes
Yes - you can resync the scene by reloading the iModel as a new scene. It will look to see if you already have a LiveCube with the same model name and then it will re-import into that model (or at...
View ArticleForum Post: RE: Re-sync .bim in LumenRT and Re-use of already created scenes
Thanks, Jacqueline and David, This did help in syncing the model, but as soon as the sync got complete a new issue started appearing. Now, the entire main window and movie editor window is flickering...
View ArticleForum Post: RE: Unable to access SYNCHRO Control Project
Dear, Paolomee, Yes, it is a Demo project
View ArticleForum Post: can't open a SYNCHRO Control project in SYNCHRO 4D Pro
1. I setup iModel and get 4D label 2. I have admin role But can't open cloud-hosted 4D project in the SYNCHRO 4D
View ArticleForum Post: RE: Quantities in tasks from resources tied in resource groups
The formulas separately works well, I can sum the resources and group resources, although I have to create a formula to calculate the activities with resources and another formula to calculate the...
View ArticleForum Post: RE: can't open a SYNCHRO Control project in SYNCHRO 4D Pro
Hi Dmytro, The steps are perfectly correct. I just saw the same issue being solved by the following: We have sorted out the issue: it is the VPN connection. for some reason the secure authentication...
View ArticleForum Post: RE: Quantities in tasks from resources tied in resource groups
I mean, the two formulas works fine when used in different user fields. I wanted to use the same user field when the task is using resource groups or only resources.
View ArticleForum Post: RE: can't open a SYNCHRO Control project in SYNCHRO 4D Pro
Dear Alexandru, I'm working from home and not use VPN, besides I try two types of connection: 1) my home internet provider, 2) mobile internet. But still can't open cloud-hosted 4D project in the...
View ArticleForum Post: Why does the script work in one file and for the second has a...
My script works fine on one file, but on second it looks good in preview and after running I get the status "Not supported". In both projects I have human resource "Hrs" assigned to multiple task and...
View ArticleForum Post: RE: Why does the script work in one file and for the second has a...
Hi Daria, The script on the first working example is actually different from the other one. In the first example, you are extracting the Assignment Property and inputting it to a Task UF, however, in...
View ArticleForum Post: RE: can't open a SYNCHRO Control project in SYNCHRO 4D Pro
Have you also tried the fix proposed by our colleague Paolomee: Close 4D Pro (if it is open) and close the browser where you have Control open Type regedit in windows search bar and hit enter In the...
View ArticleForum Post: RE: can't open a SYNCHRO Control project in SYNCHRO 4D Pro
Yes, its realy work. Thanks a lot
View ArticleForum Post: RE: Unable to access SYNCHRO Control Project
Dmytro, Unfortunately, in demo project the option "Set up this iModel for scheduling service is disabled". You will have to create a regular project to use that feature. Hope this helps. Best, Paolomee
View ArticleForum Post: RE: Unable to access SYNCHRO Control Project
Thanks, Francesco, for the information. Glad the issue is sorted out now. Best, Paolomee
View ArticleForum Post: RE: Quantities in tasks from resources tied in resource groups
Hi Robson, I think you can try this Script. Here I like to use Script. You need to run this script in two parts. Part 1. TASK (SELECTED) ASSIGN_UF ("V_1" , FLOAT , SUM (RESOURCE.UFV_ZERO("[Tekla...
View ArticleForum Post: 3D Notations (Footnote / Comment) - Modifying the input (based on...
Hi all, We are looking for a solution for creating a footnote / comment automatically based on a property. Normally, the function footnote / comment will give area, length or coordinates automatically...
View Article